Experience
5/20/2013
to
current Net-Com
services inc.
st pete beach, fl
construction
manager
·
Performed Bid Walks, managed site build
teams
·
Coordinate site pickups, prep, test and
installs
·
Oversee and complete site tests including
RF sweeps with Anritsu S361E and fiber db loss and scopes
·
Trouble shoot problem sites with tiger
teams
·
Build Site Close Out Packages including
pictures, scopes, sweeps, earth resistance etc tests.
·
Met with various inspectors to close out
all permits.
·
Manager Warehouse and site Material orders
through various supply houses like Graybar, Talleys , Connecit , etc.
9/15/2012
to 5/18/2013
wolf
communications
ottertail, mn
field
service and build engineer
·
Collect, review and engineer Construction
Drawings for NSN Flexi 2G and 3G Base Stations
·
Coordinate the pickup, delivery and
installation of Flexi BS systems
·
Compose and Submit daily shift reports for
crew and join conference calls as needed
·
Install test and scope fiber cables and
feeders for single mode and multimode fiber arrangements
·
Swept RF lines with Anritsu S361E for rf
hardline reuse
·
Build Site Close Out Packages
·
Earned NSN Commissioning and Integration
Certification (PTID)
7/10/2012
to 09/15/2012
gci
anchorage, ak
fiber
to premise field engineer
·
Design and draw route for Micro fiber to
installed as per code
·
Met with business owners for proposed
engineered route
·
Contact, setup accounts and order
materials from vendors such as Grainger
·
Coordinate, train and supervise the
installation of fiber equipment and fiber
·
Complete close out package for submission
of payment
10/10/2010
to 01/01/2012
wolf
communications
ottertail, mn
field
engineer
·
Optimize, calibrate and load results onto
GLI cards
·
Construct BTS hardware installation for
UBS BTS units
·
Perform hardware and software upgrades
including carrier adds to 4812 BTS Units
·
Power up and test utilizing procedures as
per MOP
·
Configure sites for EBH back haul
·
Verify Call tests including Voice Call P
and EVDO speed tests
9/18/2009
to 10/10/2010
nortel
networks
richardson, tx
IR
field Technician
·
Coordinate and supervise teams to install
Nortel Bts 652 green field sites for Cross Tel
·
Optimize Nortel BTS Cell Site equipment
including Nortel
BTS 652,3030,
3031, Compact, and Classic Metro Cell Indoor and Out
·
Upgrade FRM, MFRM-2 and MFRM-3 radios
·
Install -48V power cables for various
upgrades on both indoor and outdoor BTS configuration
·
Drive test CDMA EVDO Sectors on above cell
site
6/8/2009
to 9/15/2009
S-C0m
Inc
miiramar, fl
IR
field Technician
·
Install, commission, test and trouble
shoot Nortel BTS 3031
·
Perform Antenna sweeps with Anritsu
·
Perform Power Load with PIMs test set
·
Test T-1 circuits with JDSU T-1 test set
·
Make Call tests including Voice Call P,
966, 911 and EVDO speed tests
|